Preparatory works for the HS2 high-speed rail link at the South Portal site are pictured on 14 September 2020 in West Hyde, United Kingdom. A 17m headwall for the 10-mile Chiltern Tunnel was recently completed at the site as a prelude to three years of drilling through the Chilterns using two German-made 2,000 tonne tunnel boring machines (TBMs).