Show Navigation
back to search results

HS2 Works Chalfont St Giles

A temporary haul road is prepared for HGVs to use in the construction of a ventilation shaft for the Chiltern Tunnel on the HS2 high-speed rail link on 18th July 2020 in Chalfont St Giles, United Kingdom. The Department for Transport approved the issuing of Notices to Proceed by HS2 Ltd to the four Main Works Civils Contractors MWCC working on the £106bn rail project in April 2020.

Add to Cart Add to Lightbox Download
Filename
MK-20200718-HS2-works-Chalfont-St-Giles-042.jpg
Copyright
Mark Kerrison
Image Size
3000x2000 / 754.0KB
access road bottom house farm lane britain british chalfont st giles chiltern tunnel chilterns countryside england english environment environmental ground clearance haul road high speed 2 high speed rail high speed rail link high speed two high-speed 2 high-speed rail high-speed rail link high-speed two hs2 rail railway trackway transport tunnel uk united kingdom vegetation clearance vent shaft ventilation shaft
Contained in galleries
Mark Kerrison - All pics
A temporary haul road is prepared for HGVs to use in the construction of a ventilation shaft for the Chiltern Tunnel on the HS2 high-speed rail link on 18th July 2020 in Chalfont St Giles, United Kingdom. The Department for Transport approved the issuing of Notices to Proceed by HS2 Ltd to the four Main Works Civils Contractors MWCC working on the £106bn rail project in April 2020.
Prev Next
Info
  • Facebook
  • Twitter
x

In Pictures

  • About
  • Contact
  • Join In Pictures
  • Archive
    • All Galleries
    • Search
    • Cart
    • Lightbox
    • Client Area