Show Navigation
back to search results

Lao PDR - Nam Ou river - Construction worker at the relocation village due to the Nam Ou Cascade Hydropower Project Dam 6

An Akha man from a nearby village working on the construction of the new village of Ban Sam Sang, Phongsaly province, Lao PDR. Four Laoseng ethnic minority villages will be relocated permanently to this new village before the end of 2015 due to the construction of the Nam Ou Cascade Hydropower project.

Add to Cart Add to Lightbox Download
Filename
A0031125cc_1.jpg
Copyright
Tessa Bunney
Image Size
4000x2999 / 1.8MB
Asia Bunney Lao Laos PDR Phongsali Phongsaly Southeast Tessa build building construction dam development relocate relocation hydropower local man male Akha ethnic minority worker workers village
Contained in galleries
Lao PDR - Nam Ou River, Tessa Bunney - All pics
An Akha man from a nearby village working on the construction of the new village of Ban Sam Sang, Phongsaly province, Lao PDR. Four Laoseng ethnic minority villages will be relocated permanently to this new village before the end of 2015 due to the construction of the Nam Ou Cascade Hydropower project.
Prev Next
Info
  • Facebook
  • Twitter
x

In Pictures

  • About
  • Contact
  • Join In Pictures
  • Archive
    • All Galleries
    • Search
    • Cart
    • Lightbox
    • Client Area