Show Navigation

Search Results

Refine Search
Match all words
Match any word
Prints
Personal Use
Royalty-Free
Rights-Managed
(leave unchecked to
search all images)
{ 96 images found }

Loading ()...

  • An HS2 security guard is taken away on a river boat after he removed an item belonging to an activist during tree felling works alongside HOAC lake in connection with the HS2 high-speed rail link on 21 September 2020 in Harefield, United Kingdom. Anti-HS2 activists continue to try to prevent or delay works for the controversial £106bn HS2 high-speed rail link on environmental and cost grounds from a series of protection camps based along the route of the line between London and Birmingham.
    MK-20200921-HS2-Activists-Delay-Tree...jpg
  • HS2 security guards monitor an anti-HS2 activist standing in the Grand Union Canal to halt tree felling works alongside HOAC lake in connection with the HS2 high-speed rail link on 21 September 2020 in Harefield, United Kingdom. Anti-HS2 activists continue to try to prevent or delay works for the controversial £106bn HS2 high-speed rail link on environmental and cost grounds from a series of protection camps based along the route of the line between London and Birmingham.
    MK-20200921-HS2-Activists-Delay-Tree...jpg
  • An environmental activist climbs over a HS2 security fence during the restaging of a historical 1602 visit by Queen Elizabeth I to Dews Farm on 31st July 2020 in Harefield, United Kingdom. The activists tried to retrace the steps of Queen Elizabeth I from St Mary’s church to Dews Farm in order to pay their respects to Anne and Ron Ryall, 73 and 72, on the day of their eviction from Dews Farm by HS2 after having spent nine years and their life savings renovating their £1m dream home, but found their path blocked by HS2 fences and security guards.
    MK-20200731-HS2-Queen-Elizabeth-I-Ha...jpg
  • HS2 security guards monitor two anti-HS2 activists swimming in the Grand Union Canal to halt tree felling works alongside HOAC lake in connection with the HS2 high-speed rail link on 21 September 2020 in Harefield, United Kingdom. Anti-HS2 activists continue to try to prevent or delay works for the controversial £106bn HS2 high-speed rail link on environmental and cost grounds from a series of protection camps based along the route of the line between London and Birmingham.
    MK-20200921-HS2-Activists-Delay-Tree...jpg
  • Environmental activists from groups opposed to the HS2 high-speed rail link restage a historical 1602 visit by Queen Elizabeth I to Dews Farm on 31st July 2020 in Harefield, United Kingdom. The activists tried to retrace the steps of Queen Elizabeth I from St Mary’s church to Dews Farm in order to pay their respects to Anne and Ron Ryall, 73 and 72, on the day of their eviction from Dews Farm by HS2 after having spent nine years and their life savings renovating their £1m dream home, but found their path blocked by HS2 fences and security guards.
    MK-20200731-HS2-Queen-Elizabeth-I-Ha...jpg
  • An environmental activist in period costume opposed to the HS2 high-speed rail link restages a historical 1602 visit by Queen Elizabeth I to Dews Farm on 31st July 2020 in Harefield, United Kingdom. Activists tried to retrace the steps of Queen Elizabeth I from St Mary’s church to Dews Farm in order to pay their respects to Anne and Ron Ryall, 73 and 72, on the day of their eviction from Dews Farm by HS2 after having spent nine years and their life savings renovating their £1m dream home, but found their path blocked by HS2 fences and security guards.
    MK-20200731-HS2-Queen-Elizabeth-I-Ha...jpg
  • HS2 workers carry out tree felling works alongside the Grand Union Canal in connection with the HS2 high-speed rail link on 21 September 2020 in Harefield, United Kingdom. Thousands of trees have already been felled in the Colne Valley for the controversial £106bn rail link.
    MK-20200921-HS2-Activists-Delay-Tree...jpg
  • Environmental activists in period costume from groups opposed to the HS2 high-speed rail link restage a historical 1602 visit by Queen Elizabeth I to Dews Farm on 31st July 2020 in Harefield, United Kingdom. The activists tried to retrace the steps of Queen Elizabeth I from St Mary’s church to Dews Farm in order to pay their respects to Anne and Ron Ryall, 73 and 72, on the day of their eviction from Dews Farm by HS2 after having spent nine years and their life savings renovating their £1m dream home, but found their path blocked by HS2 fences and security guards.
    MK-20200731-HS2-Queen-Elizabeth-I-Ha...jpg
  • Environmental activists in period costume from groups opposed to the HS2 high-speed rail link restage a historical 1602 visit by Queen Elizabeth I to Dews Farm on 31st July 2020 in Harefield, United Kingdom. The activists tried to retrace the steps of Queen Elizabeth I from St Mary’s church to Dews Farm in order to pay their respects to Anne and Ron Ryall, 73 and 72, on the day of their eviction from Dews Farm by HS2 after having spent nine years and their life savings renovating their £1m dream home, but found their path blocked by HS2 fences and security guards.
    MK-20200731-HS2-Queen-Elizabeth-I-Ha...jpg
  • An environmental activist is monitored by HS2 security guards after climbing over a fence during the restaging of a historical 1602 visit by Queen Elizabeth I to Dews Farm on 31st July 2020 in Harefield, United Kingdom. The activists tried to retrace the steps of Queen Elizabeth I from St Mary’s church to Dews Farm in order to pay their respects to Anne and Ron Ryall, 73 and 72, on the day of their eviction from Dews Farm by HS2 after having spent nine years and their life savings renovating their £1m dream home, but found their path blocked by HS2 fences and security guards.
    MK-20200731-HS2-Queen-Elizabeth-I-Ha...jpg
  • An environmental activist in period costume opposed to the HS2 high-speed rail link restages a historical 1602 visit by Queen Elizabeth I to Dews Farm on 31st July 2020 in Harefield, United Kingdom. Activists tried to retrace the steps of Queen Elizabeth I from St Mary’s church to Dews Farm in order to pay their respects to Anne and Ron Ryall, 73 and 72, on the day of their eviction from Dews Farm by HS2 after having spent nine years and their life savings renovating their £1m dream home, but found their path blocked by HS2 fences and security guards.
    MK-20200731-HS2-Queen-Elizabeth-I-Ha...jpg
  • Environmental activists in period costume from groups opposed to the HS2 high-speed rail link restage a historical 1602 visit by Queen Elizabeth I to Dews Farm on 31st July 2020 in Harefield, United Kingdom. The activists tried to retrace the steps of Queen Elizabeth I from St Mary’s church to Dews Farm in order to pay their respects to Anne and Ron Ryall, 73 and 72, on the day of their eviction from Dews Farm by HS2 after having spent nine years and their life savings renovating their £1m dream home, but found their path blocked by HS2 fences and security guards.
    MK-20200731-HS2-Queen-Elizabeth-I-Ha...jpg
  • An anti-HS2 banner is displayed at Harvil Road protection camp opposite a construction site for the HS2 high-speed rail link on 29th July 2020 in Harefield, United Kingdom. Environmental activists based at a series of such camps have been attempting to disrupt the felling of many thousands of trees in the Colne Valley for the high-speed rail project.
    MK-20200729-HS2-Harvil-Road-Harefiel...jpg
  • A sign accusing HS2 of ecocide is displayed at Harvil Road protection camp opposite a site stripped of trees for the HS2 high-speed rail link on 29th July 2020 in Harefield, United Kingdom. Environmental activists based at a series of such camps have been attempting to disrupt the felling of many thousands of trees in the Colne Valley for the high-speed rail project.
    MK-20200729-HS2-Harvil-Road-Harefiel...jpg
  • Anti-HS2 signs are displayed at Harvil Road protection camp opposite a construction site for the HS2 high-speed rail link on 29th July 2020 in Harefield, United Kingdom. Environmental activists based at a series of such camps have been attempting to disrupt the felling of many thousands of trees in the Colne Valley for the high-speed rail project.
    MK-20200729-HS2-Harvil-Road-Harefiel...jpg
  • HS2 workers survey ground clearance work for the HS2 high-speed rail link on 13th July 2020 in Harefield, United Kingdom. Thousands of trees have been felled in the Colne Valley for the £106bn project which will remain a net contributor to CO2 emissions during its projected 120-year lifetime.
    MK-20200713-HS2-Rebellion-Harefield-...jpg
  • The rear of Dews Farm is seen on 31st July 2020 in Harefield, United Kingdom. Anne and Ron Ryall, 73 and 72, are expected to be evicted from Dews Farm by HS2 Ltd on 31st July following the compulsory purchase of their £1m property which they had spent nine years and their life savings renovating.
    MK-20200731-HS2-Queen-Elizabeth-I-Ha...jpg
  • An environmental activist in period costume opposed to the HS2 high-speed rail link restages a historical 1602 visit by Queen Elizabeth I to Dews Farm on 31st July 2020 in Harefield, United Kingdom. Activists tried to retrace the steps of Queen Elizabeth I from St Mary’s church to Dews Farm in order to pay their respects to Anne and Ron Ryall, 73 and 72, on the day of their eviction from Dews Farm by HS2 after having spent nine years and their life savings renovating their £1m dream home, but found their path blocked by HS2 fences and security guards.
    MK-20200731-HS2-Queen-Elizabeth-I-Ha...jpg
  • Metropolitan Police officers prepare to return an item removed without permission by an HS2 security guard from an anti-HS2 activist during tree felling works alongside the Grand Union Canal in connection with the HS2 high-speed rail link on 21 September 2020 in Harefield, United Kingdom.  Anti-HS2 activists continue to try to prevent or delay works for the controversial £106bn HS2 high-speed rail link on environmental and cost grounds from a series of protection camps based along the route of the line between London and Birmingham.
    MK-20200921-HS2-Activists-Delay-Tree...jpg
  • HS2 security guards monitor two anti-HS2 activists swimming in the Grand Union Canal to halt tree felling works alongside HOAC lake in connection with the HS2 high-speed rail link on 21 September 2020 in Harefield, United Kingdom. Anti-HS2 activists continue to try to prevent or delay works for the controversial £106bn HS2 high-speed rail link on environmental and cost grounds from a series of protection camps based along the route of the line between London and Birmingham.
    MK-20200921-HS2-Activists-Delay-Tree...jpg
  • An anti-HS2 activist swims in the Grand Union Canal to halt tree felling works alongside HOAC lake in connection with the HS2 high-speed rail link on 21 September 2020 in Harefield, United Kingdom. Anti-HS2 activists continue to try to prevent or delay works for the controversial £106bn HS2 high-speed rail link on environmental and cost grounds from a series of protection camps based along the route of the line between London and Birmingham.
    MK-20200921-HS2-Activists-Delay-Tree...jpg
  • Environmental activists in period costume from groups opposed to the HS2 high-speed rail link, one of which on the other side of the security fence, restage a historical 1602 visit by Queen Elizabeth I to Dews Farm on 31st July 2020 in Harefield, United Kingdom. The activists tried to retrace the steps of Queen Elizabeth I from St Mary’s church to Dews Farm in order to pay their respects to Anne and Ron Ryall, 73 and 72, on the day of their eviction from Dews Farm by HS2 after having spent nine years and their life savings renovating their £1m dream home, but found their path blocked by HS2 fences and security guards.
    MK-20200731-HS2-Queen-Elizabeth-I-Ha...jpg
  • Environmental activists in period costume from groups opposed to the HS2 high-speed rail link restage a historical 1602 visit by Queen Elizabeth I to Dews Farm on 31st July 2020 in Harefield, United Kingdom. The activists tried to retrace the steps of Queen Elizabeth I from St Mary’s church to Dews Farm in order to pay their respects to Anne and Ron Ryall, 73 and 72, on the day of their eviction from Dews Farm by HS2 after having spent nine years and their life savings renovating their £1m dream home, but found their path blocked by HS2 fences and security guards.
    MK-20200731-HS2-Queen-Elizabeth-I-Ha...jpg
  • Environmental activists in period costume from groups opposed to the HS2 high-speed rail link restage a historical 1602 visit by Queen Elizabeth I to Dews Farm on 31st July 2020 in Harefield, United Kingdom. The activists tried to retrace the steps of Queen Elizabeth I from St Mary’s church to Dews Farm in order to pay their respects to Anne and Ron Ryall, 73 and 72, on the day of their eviction from Dews Farm by HS2 after having spent nine years and their life savings renovating their £1m dream home, but found their path blocked by HS2 fences and security guards.
    MK-20200731-HS2-Queen-Elizabeth-I-Ha...jpg
  • Environmental activists in period costume from groups opposed to the HS2 high-speed rail link restage a historical 1602 visit by Queen Elizabeth I to Dews Farm on 31st July 2020 in Harefield, United Kingdom. The activists tried to retrace the steps of Queen Elizabeth I from St Mary’s church to Dews Farm in order to pay their respects to Anne and Ron Ryall, 73 and 72, on the day of their eviction from Dews Farm by HS2 after having spent nine years and their life savings renovating their £1m dream home, but found their path blocked by HS2 fences and security guards.
    MK-20200731-HS2-Queen-Elizabeth-I-Ha...jpg
  • Environmental activists in period costume from groups opposed to the HS2 high-speed rail link restage a historical 1602 visit by Queen Elizabeth I to Dews Farm on 31st July 2020 in Harefield, United Kingdom. The activists tried to retrace the steps of Queen Elizabeth I from St Mary’s church to Dews Farm in order to pay their respects to Anne and Ron Ryall, 73 and 72, on the day of their eviction from Dews Farm by HS2 after having spent nine years and their life savings renovating their £1m dream home, but found their path blocked by HS2 fences and security guards.
    MK-20200731-HS2-Queen-Elizabeth-I-Ha...jpg
  • Environmental activists in period costume from groups opposed to the HS2 high-speed rail link restage a historical 1602 visit by Queen Elizabeth I to Dews Farm on 31st July 2020 in Harefield, United Kingdom. The activists tried to retrace the steps of Queen Elizabeth I from St Mary’s church to Dews Farm in order to pay their respects to Anne and Ron Ryall, 73 and 72, on the day of their eviction from Dews Farm by HS2 after having spent nine years and their life savings renovating their £1m dream home, but found their path blocked by HS2 fences and security guards.
    MK-20200731-HS2-Queen-Elizabeth-I-Ha...jpg
  • Environmental activists in period costume from groups opposed to the HS2 high-speed rail link restage a historical 1602 visit by Queen Elizabeth I to Dews Farm on 31st July 2020 in Harefield, United Kingdom. The activists tried to retrace the steps of Queen Elizabeth I from St Mary’s church to Dews Farm in order to pay their respects to Anne and Ron Ryall, 73 and 72, on the day of their eviction from Dews Farm by HS2 after having spent nine years and their life savings renovating their £1m dream home, but found their path blocked by HS2 fences and security guards.
    MK-20200731-HS2-Queen-Elizabeth-I-Ha...jpg
  • Environmental activists in period costume from groups opposed to the HS2 high-speed rail link restage a historical 1602 visit by Queen Elizabeth I to Dews Farm on 31st July 2020 in Harefield, United Kingdom. The activists tried to retrace the steps of Queen Elizabeth I from St Mary’s church to Dews Farm in order to pay their respects to Anne and Ron Ryall, 73 and 72, on the day of their eviction from Dews Farm by HS2 after having spent nine years and their life savings renovating their £1m dream home, but found their path blocked by HS2 fences and security guards.
    MK-20200731-HS2-Queen-Elizabeth-I-Ha...jpg
  • HS2 workers carry out monitoring work for the high-speed rail link on 29th July 2020 in Harefield, United Kingdom. HS2 is currently engaged in ground clearance, drilling and testing activities in the Colne Valley, including the felling of many thousands of trees.
    MK-20200729-HS2-Harvil-Road-Harefiel...jpg
  • A hammock is suspended between trees alongside Harvil Road which environmental activists are seeking to protect from felling for the HS2 high-speed rail link on 29th July 2020 in Harefield, United Kingdom. Activists based at a series of wildlife protection camps have been attempting to disrupt the removal of many thousands of trees in the Colne Valley for the high-speed rail project.
    MK-20200729-HS2-Harvil-Road-Harefiel...jpg
  • A few remaining trees stand on one side of Harvil Road on 29th July 2020 in Harefield, United Kingdom. Activists based at a series of wildlife protection camps have been attempting to disrupt the felling of many thousands of trees in the Colne Valley for the HS2 high-speed rail project.
    MK-20200729-HS2-Harvil-Road-Harefiel...jpg
  • A mechanical digger is used close to Dews Farm for ground clearance work for the HS2 high-speed rail link on 13th July 2020 in Harefield, United Kingdom. Dews Farm, which was visited by Queen Elizabeth I in 1602 and was the birthplace of Victoria Cross holder Cecil John Kinross in 1896, is expected to be demolished in the near future.
    MK-20200713-HS2-Rebellion-Harefield-...jpg
  • Ground clearance work for the HS2 high-speed rail link on 13th July 2020 in Harefield, United Kingdom. Thousands of trees have been felled in the Colne Valley for the £106bn project which will remain a net contributor to CO2 emissions during its projected 120-year lifetime.
    MK-20200713-HS2-Rebellion-Harefield-...jpg
  • HS2 security guards monitor an anti-HS2 activist standing in the Grand Union Canal to halt tree felling works alongside HOAC lake in connection with the HS2 high-speed rail link on 21 September 2020 in Harefield, United Kingdom. Anti-HS2 activists continue to try to prevent or delay works for the controversial £106bn HS2 high-speed rail link on environmental and cost grounds from a series of protection camps based along the route of the line between London and Birmingham.
    MK-20200921-HS2-Activists-Delay-Tree...jpg
  • An HS2 security guard monitors an anti-HS2 activist standing in the Grand Union Canal to halt tree felling works alongside HOAC lake in connection with the HS2 high-speed rail link on 21 September 2020 in Harefield, United Kingdom. Anti-HS2 activists continue to try to prevent or delay works for the controversial £106bn HS2 high-speed rail link on environmental and cost grounds from a series of protection camps based along the route of the line between London and Birmingham.
    MK-20200921-HS2-Activists-Delay-Tree...jpg
  • A HS2 security guard films a press photographer on a public footpath during tree felling works alongside the Grand Union Canal in connection with the HS2 high-speed rail link on 21 September 2020 in Harefield, United Kingdom. Thousands of trees have already been felled in the Colne Valley for the controversial £106bn rail link.
    MK-20200921-HS2-Activists-Delay-Tree...jpg
  • An environmental activist is monitored by HS2 security guards after climbing over a fence during the restaging of a historical 1602 visit by Queen Elizabeth I to Dews Farm on 31st July 2020 in Harefield, United Kingdom. The activists tried to retrace the steps of Queen Elizabeth I from St Mary’s church to Dews Farm in order to pay their respects to Anne and Ron Ryall, 73 and 72, on the day of their eviction from Dews Farm by HS2 after having spent nine years and their life savings renovating their £1m dream home, but found their path blocked by HS2 fences and security guards.
    MK-20200731-HS2-Queen-Elizabeth-I-Ha...jpg
  • Environmental activists in period costume from groups opposed to the HS2 high-speed rail link restage a historical 1602 visit by Queen Elizabeth I to Dews Farm on 31st July 2020 in Harefield, United Kingdom. The activists tried to retrace the steps of Queen Elizabeth I from St Mary’s church to Dews Farm in order to pay their respects to Anne and Ron Ryall, 73 and 72, on the day of their eviction from Dews Farm by HS2 after having spent nine years and their life savings renovating their £1m dream home, but found their path blocked by HS2 fences and security guards.
    MK-20200731-HS2-Queen-Elizabeth-I-Ha...jpg
  • Environmental activists in period costume from groups opposed to the HS2 high-speed rail link restage a historical 1602 visit by Queen Elizabeth I to Dews Farm on 31st July 2020 in Harefield, United Kingdom. The activists tried to retrace the steps of Queen Elizabeth I from St Mary’s church to Dews Farm in order to pay their respects to Anne and Ron Ryall, 73 and 72, on the day of their eviction from Dews Farm by HS2 after having spent nine years and their life savings renovating their £1m dream home, but found their path blocked by HS2 fences and security guards.
    MK-20200731-HS2-Queen-Elizabeth-I-Ha...jpg
  • Environmental activists from groups opposed to the HS2 high-speed rail link hold a banner during the restating of a historical 1602 visit by Queen Elizabeth I to Dews Farm on 31st July 2020 in Harefield, United Kingdom. The activists tried to retrace the steps of Queen Elizabeth I from St Mary’s church to Dews Farm in order to pay their respects to Anne and Ron Ryall, 73 and 72, on the day of their eviction from Dews Farm by HS2 after having spent nine years and their life savings renovating their £1m dream home, but found their path blocked by HS2 fences and security guards.
    MK-20200731-HS2-Queen-Elizabeth-I-Ha...jpg
  • Environmental activists in period costume from groups opposed to the HS2 high-speed rail link restage a historical 1602 visit by Queen Elizabeth I to Dews Farm on 31st July 2020 in Harefield, United Kingdom. The activists tried to retrace the steps of Queen Elizabeth I from St Mary’s church to Dews Farm in order to pay their respects to Anne and Ron Ryall, 73 and 72, on the day of their eviction from Dews Farm by HS2 after having spent nine years and their life savings renovating their £1m dream home, but found their path blocked by HS2 fences and security guards.
    MK-20200731-HS2-Queen-Elizabeth-I-Ha...jpg
  • A few remaining trees stand on one side of Harvil Road on 29th July 2020 in Harefield, United Kingdom. Activists based at a series of wildlife protection camps have been attempting to disrupt the felling of many thousands of trees in the Colne Valley for the HS2 high-speed rail project.
    MK-20200729-HS2-Harvil-Road-Harefiel...jpg
  • Warning notices are displayed outside a gate to a construction site for the HS2 high-speed rail link on 29th July 2020 in Harefield, United Kingdom. Environmental activists based in the vicinity have been trying to disrupt HS2’s activities in the Colne Valley including the felling of many thousands of trees and drilling into the chalk aquifer.
    MK-20200729-HS2-Harvil-Road-Harefiel...jpg
  • Ground clearance work for the HS2 high-speed rail link on 13th July 2020 in Harefield, United Kingdom. Thousands of trees have been felled in the Colne Valley for the £106bn project which will remain a net contributor to CO2 emissions during its projected 120-year lifetime.
    MK-20200713-HS2-Rebellion-Harefield-...jpg
  • HS2 workers survey ground clearance work for the HS2 high-speed rail link on 13th July 2020 in Harefield, United Kingdom. Thousands of trees have been felled in the Colne Valley for the £106bn project which will remain a net contributor to CO2 emissions during its projected 120-year lifetime.
    MK-20200713-HS2-Rebellion-Harefield-...jpg
  • HS2 workers survey ground clearance work for the HS2 high-speed rail link on 13th July 2020 in Harefield, United Kingdom. Thousands of trees have been felled in the Colne Valley for the £106bn project which will remain a net contributor to CO2 emissions during its projected 120-year lifetime.
    MK-20200713-HS2-Rebellion-Harefield-...jpg
  • HS2 security guards monitor an anti-HS2 activist swimming in the Grand Union Canal to halt tree felling works alongside HOAC lake in connection with the HS2 high-speed rail link on 21 September 2020 in Harefield, United Kingdom. Anti-HS2 activists continue to try to prevent or delay works for the controversial £106bn HS2 high-speed rail link on environmental and cost grounds from a series of protection camps based along the route of the line between London and Birmingham.
    MK-20200921-HS2-Activists-Delay-Tree...jpg
  • Environmental activists in period costume from groups opposed to the HS2 high-speed rail link restage a historical 1602 visit by Queen Elizabeth I to Dews Farm on 31st July 2020 in Harefield, United Kingdom. The activists tried to retrace the steps of Queen Elizabeth I from St Mary’s church to Dews Farm in order to pay their respects to Anne and Ron Ryall, 73 and 72, on the day of their eviction from Dews Farm by HS2 after having spent nine years and their life savings renovating their £1m dream home, but found their path blocked by HS2 fences and security guards.
    MK-20200731-HS2-Queen-Elizabeth-I-Ha...jpg
  • Environmental activists in period costume from groups opposed to the HS2 high-speed rail link restage a historical 1602 visit by Queen Elizabeth I to Dews Farm on 31st July 2020 in Harefield, United Kingdom. The activists tried to retrace the steps of Queen Elizabeth I from St Mary’s church to Dews Farm in order to pay their respects to Anne and Ron Ryall, 73 and 72, on the day of their eviction from Dews Farm by HS2 after having spent nine years and their life savings renovating their £1m dream home, but found their path blocked by HS2 fences and security guards.
    MK-20200731-HS2-Queen-Elizabeth-I-Ha...jpg
  • Environmental activists in period costume from groups opposed to the HS2 high-speed rail link restage a historical 1602 visit by Queen Elizabeth I to Dews Farm on 31st July 2020 in Harefield, United Kingdom. The activists tried to retrace the steps of Queen Elizabeth I from St Mary’s church to Dews Farm in order to pay their respects to Anne and Ron Ryall, 73 and 72, on the day of their eviction from Dews Farm by HS2 after having spent nine years and their life savings renovating their £1m dream home, but found their path blocked by HS2 fences and security guards.
    MK-20200731-HS2-Queen-Elizabeth-I-Ha...jpg
  • A hammock is suspended between trees alongside Harvil Road which environmental activists are seeking to protect from felling for the HS2 high-speed rail link on 29th July 2020 in Harefield, United Kingdom. Activists based at a series of wildlife protection camps have been attempting to disrupt the removal of many thousands of trees in the Colne Valley for the high-speed rail project.
    MK-20200729-HS2-Harvil-Road-Harefiel...jpg
  • A few remaining trees stand on one side of Harvil Road on 29th July 2020 in Harefield, United Kingdom. Activists based at a series of wildlife protection camps have been attempting to disrupt the felling of many thousands of trees in the Colne Valley for the HS2 high-speed rail project.
    MK-20200729-HS2-Harvil-Road-Harefiel...jpg
  • Ground clearance work for the HS2 high-speed rail link on 13th July 2020 in Harefield, United Kingdom. Thousands of trees have been felled in the Colne Valley for the £106bn project which will remain a net contributor to CO2 emissions during its projected 120-year lifetime.
    MK-20200713-HS2-Rebellion-Harefield-...jpg
  • Young saplings planted to replace thousands of trees felled in the Colne Valley for the HS2 high-speed rail link on 13th July 2020 in Harefield, United Kingdom. The HS2 project is currently estimated to cost around £106bn and will remain a net contributor to CO2 emissions during its projected 120-year lifetime.
    MK-20200713-HS2-Rebellion-Harefield-...jpg
  • Drilling equipment for works connected to the HS2 high-speed rail link is prepared close to Harvil Road on 13th July 2020 in Harefield, United Kingdom. The rig is expected to be used imminently to drill into the chalk aquifer and environmental campaigners contend that such drilling risks contamination of the aquifer which supplies around 22% of London’s drinking water.
    MK-20200713-HS2-Rebellion-Harefield-...jpg
  • Environmental activists in period costume from groups opposed to the HS2 high-speed rail link restage a historical 1602 visit by Queen Elizabeth I to Dews Farm on 31st July 2020 in Harefield, United Kingdom. The activists tried to retrace the steps of Queen Elizabeth I from St Mary’s church to Dews Farm in order to pay their respects to Anne and Ron Ryall, 73 and 72, on the day of their eviction from Dews Farm by HS2 after having spent nine years and their life savings renovating their £1m dream home, but found their path blocked by HS2 fences and security guards.
    MK-20200731-HS2-Queen-Elizabeth-I-Ha...jpg
  • A sign indicates intended work in Harvil Road for the HS2 high-speed rail link on 29th July 2020 in Harefield, United Kingdom. HS2 is currently engaged in ground clearance, drilling and testing activities in the Colne Valley, including the felling of many thousands of trees.
    MK-20200729-HS2-Harvil-Road-Harefiel...jpg
  • Environmental activists from HS2 Rebellion sit behind a banner to block a gate providing access to a site for the HS2 high-speed rail link on 12 September 2020 in Harefield, United Kingdom. Anti-HS2 activists continue to try to prevent or delay works on the controversial £106bn HS2 high-speed rail link in the Colne Valley where thousands of trees have already been felled.
    MK-20200912-HS2-Harvil-Road-roadbloc...jpg
  • Security guards working on behalf of HS2 forcibly remove an environmental activist from HS2 Rebellion from the road in front of a gate providing access to a site for the HS2 high-speed rail link on 12 September 2020 in Harefield, United Kingdom. Anti-HS2 activists continue to try to prevent or delay works on the controversial £106bn HS2 high-speed rail link in the Colne Valley where thousands of trees have already been felled.
    MK-20200912-HS2-Harvil-Road-roadbloc...jpg
  • Security guards working on behalf of HS2 forcibly remove environmental activists from HS2 Rebellion from the road in front of a gate providing access to a site for the HS2 high-speed rail link on 12 September 2020 in Harefield, United Kingdom. Anti-HS2 activists continue to try to prevent or delay works on the controversial £106bn HS2 high-speed rail link in the Colne Valley where thousands of trees have already been felled.
    MK-20200912-HS2-Harvil-Road-roadbloc...jpg
  • Security guards working on behalf of HS2 forcibly remove environmental activists from HS2 Rebellion from the road in front of a gate providing access to a site for the HS2 high-speed rail link on 12 September 2020 in Harefield, United Kingdom. Anti-HS2 activists continue to try to prevent or delay works on the controversial £106bn HS2 high-speed rail link in the Colne Valley where thousands of trees have already been felled.
    MK-20200912-HS2-Harvil-Road-roadbloc...jpg
  • A security guard working on behalf of HS2 obstructs the photographer’s camera as his colleagues forcibly remove environmental activists from HS2 Rebellion from the road in front of a gate providing access to a site for the HS2 high-speed rail link on 12 September 2020 in Harefield, United Kingdom. Anti-HS2 activists continue to try to prevent or delay works on the controversial £106bn HS2 high-speed rail link in the Colne Valley where thousands of trees have already been felled.
    MK-20200912-HS2-Harvil-Road-roadbloc...jpg
  • Environmental activists from HS2 Rebellion sit behind banners to block a gate providing access to a site for the HS2 high-speed rail link on 12 September 2020 in Harefield, United Kingdom. Anti-HS2 activists continue to try to prevent or delay works on the controversial £106bn HS2 high-speed rail link in the Colne Valley where thousands of trees have already been felled.
    MK-20200912-HS2-Harvil-Road-roadbloc...jpg
  • Environmental activists from HS2 Rebellion stand holding a banner to block a gate providing access to a site for the HS2 high-speed rail link on 12 September 2020 in Harefield, United Kingdom. Anti-HS2 activists continue to try to prevent or delay works on the controversial £106bn HS2 high-speed rail link in the Colne Valley where thousands of trees have already been felled.
    MK-20200912-HS2-Harvil-Road-roadbloc...jpg
  • Security guards working on behalf of HS2 forcibly remove environmental activists from HS2 Rebellion from the road in front of a gate providing access to a site for the HS2 high-speed rail link on 12 September 2020 in Harefield, United Kingdom. Anti-HS2 activists continue to try to prevent or delay works on the controversial £106bn HS2 high-speed rail link in the Colne Valley where thousands of trees have already been felled.
    MK-20200912-HS2-Harvil-Road-roadbloc...jpg
  • Security guards working on behalf of HS2 forcibly remove environmental activists from HS2 Rebellion from the road in front of a gate providing access to a site for the HS2 high-speed rail link on 12 September 2020 in Harefield, United Kingdom. Anti-HS2 activists continue to try to prevent or delay works on the controversial £106bn HS2 high-speed rail link in the Colne Valley where thousands of trees have already been felled.
    MK-20200912-HS2-Harvil-Road-roadbloc...jpg
  • Environmental activists from HS2 Rebellion stand with a banner in front of a gate providing access to a site for the HS2 high-speed rail link on 12 September 2020 in Harefield, United Kingdom. Anti-HS2 activists continue to try to prevent or delay works on the controversial £106bn HS2 high-speed rail link in the Colne Valley where thousands of trees have already been felled.
    MK-20200912-HS2-Harvil-Road-roadbloc...jpg
  • Environmental activists from HS2 Rebellion sit in the road behind a banner to block a gate providing access to a site for the HS2 high-speed rail link on 12 September 2020 in Harefield, United Kingdom. Anti-HS2 activists continue to try to prevent or delay works on the controversial £106bn HS2 high-speed rail link in the Colne Valley where thousands of trees have already been felled.
    MK-20200912-HS2-Harvil-Road-roadbloc...jpg
  • Environmental activists from HS2 Rebellion sit behind banners to block a gate providing access to a site for the HS2 high-speed rail link on 12 September 2020 in Harefield, United Kingdom. Anti-HS2 activists continue to try to prevent or delay works on the controversial £106bn HS2 high-speed rail link in the Colne Valley where thousands of trees have already been felled.
    MK-20200912-HS2-Harvil-Road-roadbloc...jpg
  • A security guard working on behalf of HS2 forcibly removes an environmental activist from HS2 Rebellion from the road in front of a gate providing access to a site for the HS2 high-speed rail link on 12 September 2020 in Harefield, United Kingdom. Anti-HS2 activists continue to try to prevent or delay works on the controversial £106bn HS2 high-speed rail link in the Colne Valley where thousands of trees have already been felled.
    MK-20200912-HS2-Harvil-Road-roadbloc...jpg
  • Security guards working on behalf of HS2 remove environmental activists from HS2 Rebellion from the road in front of a gate providing access to a site for the HS2 high-speed rail link on 12 September 2020 in Harefield, United Kingdom. Anti-HS2 activists continue to try to prevent or delay works on the controversial £106bn HS2 high-speed rail link in the Colne Valley where thousands of trees have already been felled.
    MK-20200912-HS2-Harvil-Road-roadbloc...jpg
  • Security guards working on behalf of HS2 forcibly remove environmental activists from HS2 Rebellion from the road in front of a gate providing access to a site for the HS2 high-speed rail link on 12 September 2020 in Harefield, United Kingdom. Anti-HS2 activists continue to try to prevent or delay works on the controversial £106bn HS2 high-speed rail link in the Colne Valley where thousands of trees have already been felled.
    MK-20200912-HS2-Harvil-Road-roadbloc...jpg
  • Security guards working on behalf of HS2 forcibly remove environmental activists from HS2 Rebellion from the road in front of a gate providing access to a site for the HS2 high-speed rail link on 12 September 2020 in Harefield, United Kingdom. Anti-HS2 activists continue to try to prevent or delay works on the controversial £106bn HS2 high-speed rail link in the Colne Valley where thousands of trees have already been felled.
    MK-20200912-HS2-Harvil-Road-roadbloc...jpg
  • Environmental activists from HS2 Rebellion sit in the road holding banners to block a gate providing access to a site for the HS2 high-speed rail link on 12 September 2020 in Harefield, United Kingdom. Anti-HS2 activists continue to try to prevent or delay works on the controversial £106bn HS2 high-speed rail link in the Colne Valley where thousands of trees have already been felled.
    MK-20200912-HS2-Harvil-Road-roadbloc...jpg
  • Environmental activists from HS2 Rebellion stand holding a banner to block a gate providing access to a site for the HS2 high-speed rail link on 12 September 2020 in Harefield, United Kingdom. Anti-HS2 activists continue to try to prevent or delay works on the controversial £106bn HS2 high-speed rail link in the Colne Valley where thousands of trees have already been felled.
    MK-20200912-HS2-Harvil-Road-roadbloc...jpg
  • Environmental activists from HS2 Rebellion stand holding banners to block a gate providing access to a site for the HS2 high-speed rail link on 12 September 2020 in Harefield, United Kingdom. Anti-HS2 activists continue to try to prevent or delay works on the controversial £106bn HS2 high-speed rail link in the Colne Valley where thousands of trees have already been felled.
    MK-20200912-HS2-Harvil-Road-roadbloc...jpg
  • Security guards working on behalf of HS2 forcibly remove an environmental activist from HS2 Rebellion from the road in front of a gate providing access to a site for the HS2 high-speed rail link on 12 September 2020 in Harefield, United Kingdom. Anti-HS2 activists continue to try to prevent or delay works on the controversial £106bn HS2 high-speed rail link in the Colne Valley where thousands of trees have already been felled.
    MK-20200912-HS2-Harvil-Road-roadbloc...jpg
  • Activists from HS2 Rebellion and Extinction Rebellion UK stand opposite a gate to a HS2 construction site as they take part in a ‘Rebel Trail’ hike along the route of the HS2 high-speed rail link on 26th June 2020 in Harefield, United Kingdom. The activists, who departed from Birmingham on 20th June and will arrive outside Parliament in London on 27th June, are protesting against the environmental impact of the high-speed rail link and questioning the viability of the £100bn+ project.
    MK-20200626-HS2-Rebellion-Rebel-Trai...jpg
  • Environmental activists protest opposite a construction site for the HS2 high-speed rail link on 26th June 2020 in Harefield, United Kingdom. The activists, from HS2 Rebellion and Extinction Rebellion UK, are taking part in a ‘Rebel Trail’ hike along the route of the high-speed rail link from Birmingham to London in protest against its environmental impact and to question the viability of the £100bn+ project.
    MK-20200626-HS2-Rebellion-Rebel-Trai...jpg
  • HS2 workers stand at a gate to a construction site for the high-speed rail link on 26th June 2020 in Harefield, United Kingdom. They were observing activists from HS2 Rebellion and Extinction Rebellion UK taking part in a ‘Rebel Trail’ hike along the route of the high-speed rail link in protest against its environmental impact and to question the viability of the £100bn+ project.
    MK-20200626-HS2-Rebellion-Rebel-Trai...jpg
  • A HS2 security guard observes activists from HS2 Rebellion and Extinction Rebellion UK taking part in a ‘Rebel Trail’ hike along the route of the HS2 high-speed rail link on 26th June 2020 in Harefield, United Kingdom. The activists, who departed from Birmingham on 20th June and will arrive outside Parliament in London on 27th June, are protesting against the environmental impact of the high-speed rail link and questioning the viability of the £100bn+ project.
    MK-20200626-HS2-Rebellion-Rebel-Trai...jpg
  • Large sections of trunk from a felled mature oak tree are seen in a compound used by contractors working on the HS2 high-speed rail project on 26th June 2020 in Harefield, United Kingdom. Activists from HS2 Rebellion and Extinction Rebellion UK, some of whom living in the tree, had sought to prevent its destruction for several months as part of an ongoing protest against the environmental impact of the high-speed rail link and the cost of the £100bn+ project.
    MK-20200626-HS2-Rebellion-Rebel-Trai...jpg
  • A sign indicates a gate to a construction site in the Colne Valley for the HS2 high-speed rail link on 26th June 2020 in Harefield, United Kingdom. Extensive preparatory works for the HS2 project continue in the Colne Valley in spite of stubborn resistance from environmental campaigners seeking to protect woodland and wetland habitats in the area.
    MK-20200626-HS2-Rebellion-Rebel-Trai...jpg
  • Activists from HS2 Rebellion and Extinction Rebellion UK pass a HS2 road closure as they take part in a ‘Rebel Trail’ hike along the route of the HS2 high-speed rail link on 26th June 2020 in Harefield, United Kingdom. The activists, who departed from Birmingham on 20th June and will arrive outside Parliament in London on 27th June, are protesting against the environmental impact of the high-speed rail link and questioning the viability of the £100bn+ project.
    MK-20200626-HS2-Rebellion-Rebel-Trai...jpg
  • HS2 security guards stand in front of a road closure as they observe activists from HS2 Rebellion and Extinction Rebellion UK taking part in a ‘Rebel Trail’ hike along the route of the HS2 high-speed rail link on 26th June 2020 in Harefield, United Kingdom. The activists, who departed from Birmingham on 20th June and will arrive outside Parliament in London on 27th June, are protesting against the environmental impact of the high-speed rail link and questioning the viability of the £100bn+ project.
    MK-20200626-HS2-Rebellion-Rebel-Trai...jpg
  • Activists from HS2 Rebellion and Extinction Rebellion UK pass a gate to a HS2 construction site as they take part in a ‘Rebel Trail’ hike along the route of the HS2 high-speed rail link on 26th June 2020 in Harefield, United Kingdom. The activists, who departed from Birmingham on 20th June and will arrive outside Parliament in London on 27th June, are protesting against the environmental impact of the high-speed rail link and questioning the viability of the £100bn+ project.
    MK-20200626-HS2-Rebellion-Rebel-Trai...jpg
  • Environmental activists protest opposite a construction site for the HS2 high-speed rail link on 26th June 2020 in Harefield, United Kingdom. The activists, from HS2 Rebellion and Extinction Rebellion UK, are taking part in a ‘Rebel Trail’ hike along the route of the high-speed rail link from Birmingham to London in protest against its environmental impact and to question the viability of the £100bn+ project.
    MK-20200626-HS2-Rebellion-Rebel-Trai...jpg
  • Activists from HS2 Rebellion and Extinction Rebellion UK pass a gate to a HS2 construction site as they take part in a ‘Rebel Trail’ hike along the route of the HS2 high-speed rail link on 26th June 2020 in Harefield, United Kingdom. The activists, who departed from Birmingham on 20th June and will arrive outside Parliament in London on 27th June, are protesting against the environmental impact of the high-speed rail link and questioning the viability of the £100bn+ project.
    MK-20200626-HS2-Rebellion-Rebel-Trai...jpg
  • Environmental activists protest opposite a construction site for the HS2 high-speed rail link on 26th June 2020 in Harefield, United Kingdom. The activists, from HS2 Rebellion and Extinction Rebellion UK, are taking part in a ‘Rebel Trail’ hike along the route of the high-speed rail link from Birmingham to London in protest against its environmental impact and to question the viability of the £100bn+ project.
    MK-20200626-HS2-Rebellion-Rebel-Trai...jpg
  • Environmental activists protest opposite a construction site for the HS2 high-speed rail link on 26th June 2020 in Harefield, United Kingdom. The activists, from HS2 Rebellion and Extinction Rebellion UK, are taking part in a ‘Rebel Trail’ hike along the route of the high-speed rail link from Birmingham to London in protest against its environmental impact and to question the viability of the £100bn+ project.
    MK-20200626-HS2-Rebellion-Rebel-Trai...jpg
  • Activists from HS2 Rebellion and Extinction Rebellion UK pass a gate to a HS2 construction site as they take part in a ‘Rebel Trail’ hike along the route of the HS2 high-speed rail link on 26th June 2020 in Harefield, United Kingdom. The activists, who departed from Birmingham on 20th June and will arrive outside Parliament in London on 27th June, are protesting against the environmental impact of the high-speed rail link and questioning the viability of the £100bn+ project.
    MK-20200626-HS2-Rebellion-Rebel-Trai...jpg
  • Activists from HS2 Rebellion and Extinction Rebellion UK pass a gate to a HS2 construction site as they take part in a ‘Rebel Trail’ hike along the route of the HS2 high-speed rail link on 26th June 2020 in Harefield, United Kingdom. The activists, who departed from Birmingham on 20th June and will arrive outside Parliament in London on 27th June, are protesting against the environmental impact of the high-speed rail link and questioning the viability of the £100bn+ project.
    MK-20200626-HS2-Rebellion-Rebel-Trai...jpg
  • A sign indicates a gate to a construction site in the Colne Valley for the HS2 high-speed rail link on 26th June 2020 in Harefield, United Kingdom. Extensive preparatory works for the HS2 project continue in the Colne Valley in spite of ongoing stubborn resistance from environmental campaigners seeking to protect woodland and wetland habitats in the area.
    MK-20200626-HS2-Rebellion-Rebel-Trai...jpg
  • Activists from HS2 Rebellion and Extinction Rebellion UK take a knee for a recently felled mature oak tree during the ‘Rebel Trail’ hike along the route of the HS2 high-speed rail link on 26th June 2020 in Harefield, United Kingdom. The activists, who departed from Birmingham on 20th June and will arrive outside Parliament in London on 27th June, are protesting against the environmental impact of the high-speed rail link and questioning the viability of the £100bn+ project.
    MK-20200626-HS2-Rebellion-Rebel-Trai...jpg
  • A site where tree felling is currently taking place for the HS2 high-speed rail link is pictured on 11 September 2020 in Denham Green, United Kingdom. Many thousands of trees have already been felled for the HS2 project in the Colne Valley and tree felling is currently taking place in Denham Green, Denham and Harefield.
    MK-20200911-HS2-Denham-and-Denham-Gr...jpg
  • Facebook
  • Twitter
x

In Pictures

  • About
  • Contact
  • Join In Pictures
  • Archive
    • All Galleries
    • Search
    • Cart
    • Lightbox
    • Client Area