Show Navigation

Search Results

Refine Search
Match all words
Match any word
Prints
Personal Use
Royalty-Free
Rights-Managed
(leave unchecked to
search all images)
{ 6 images found }

Loading ()...

  • The newly-established 17m South Portal headwall for the 10-mile Chiltern Tunnel section of the HS2 high-speed rail link is pictured on 11th August 2020 in West Hyde, United Kingdom. Construction of the headwall and ground reinforcement using more than 636 soil nails were the final stages requiring completion prior to three years of drilling through the Chilterns using two German-made 2,000 tonne tunnel boring machines / TBMs.
    MK-20200811-HS2-Chiltern-Tunnel-Sout...jpg
  • The recently-completed 17m South Portal headwall for the 10-mile Chiltern Tunnel section of the HS2 high-speed rail link is pictured on 8 September 2020 in West Hyde, United Kingdom. Construction of the headwall and ground reinforcement using more than 636 soil nails were the final stages requiring completion prior to three years of drilling through the Chilterns using two German-made 2,000 tonne tunnel boring machines / TBMs.
    MK-20200908-HS2-Rebellion-Denham-cam...jpg
  • Preparatory works for the HS2 high-speed rail link at the South Portal site are pictured on 14 September 2020 in West Hyde, United Kingdom. A 17m headwall for the 10-mile Chiltern Tunnel was recently completed at the site as a prelude to three years of drilling through the Chilterns using two German-made 2,000 tonne tunnel boring machines (TBMs).
    MK-20200914-HS2-West-Hyde-South-Port...jpg
  • Preparatory works for the HS2 high-speed rail link at the South Portal site are pictured on 14 September 2020 in West Hyde, United Kingdom. A 17m headwall for the 10-mile Chiltern Tunnel was recently completed at the site as a prelude to three years of drilling through the Chilterns using two German-made 2,000 tonne tunnel boring machines (TBMs).
    MK-20200914-HS2-West-Hyde-South-Port...jpg
  • Preparatory works for the HS2 high-speed rail link at the South Portal site are pictured on 14 September 2020 in West Hyde, United Kingdom. A 17m headwall for the 10-mile Chiltern Tunnel was recently completed at the site as a prelude to three years of drilling through the Chilterns using two German-made 2,000 tonne tunnel boring machines (TBMs).
    MK-20200914-HS2-West-Hyde-South-Port...jpg
  • Preparatory works for the HS2 high-speed rail link at the South Portal site are pictured on 14 September 2020 in West Hyde, United Kingdom. A 17m headwall for the 10-mile Chiltern Tunnel was recently completed at the site as a prelude to three years of drilling through the Chilterns using two German-made 2,000 tonne tunnel boring machines (TBMs).
    MK-20200914-HS2-West-Hyde-South-Port...jpg
  • Facebook
  • Twitter
x

In Pictures

  • About
  • Contact
  • Join In Pictures
  • Archive
    • All Galleries
    • Search
    • Cart
    • Lightbox
    • Client Area